분야별 실적

Year Project Name Applied Technologies Capa Site
2017 Samsung Electronics Pyeongtaek
P-Project UPW System [PH-2]
FAB. Facillity Construction
삼성전자 평택 P-Project
초순수 건설공사 [PH-2]
FAB동 시설공사
UPW Treatment System
– Heat exchanger
– UV Sterilizer
– NSP
– Membrane Degasifier
– Mixed Bed Polisher
– UF Unit- Pre Heater
– Recovery Tank
10,000m3/day 평택
(Korea)
2016 LG 디스플레이 베트남 V-Project
UPW & 재이용 System
LG Display V-Project UPW
& Reuse System
Softener Package
UPW Treatment System
– MF Unit
– A/C Filter
– Heat Exchanger
– 1st RO Unit
– CEDI Unit
– Cooler
– UV Sterilizer
– Final Filter
Reclaim & Reuse System
– Reclaim MF Unit
– Reuse Pressure Filter
2,160m3/day
1,440m3/day        1,040m3/day
베트남
(Vietnam)
2016 Samsung Electronics Pyeongtaek
P-Project UPW System [PH-1]
FAB. Machine Room Construction
삼성전자 평택 P-Project
초순수 건설공사 [PH-1]
FAB동 기계실 공사
UPW Treatment System
– Heat exchanger
– TOC reduction UV
– NSP
– Membrane Degasifier
– Mixed Bed Polisher
– UF Unit
– Heater
– Recovery Tank
8,000m3/day 평택
(Korea)
2016 LG디슬플레이 파주 P9 C-Project 대응 환경설비공사 (용수전처리)
LG Display PAJU P9 C-Project Environmental Facility Construction
(Industrial Water Pretreatment)
Industrial Water Preatreatment
– Auto Strainer
– Heat exchanger
– MF Unit- Reclaim MF Unit
31,680m3/day   63m3/hr 파주
(Korea)
2016 Samsung Electronics Pyeongtaek
P-Project UPW System [PH-1]
UT Facility Construction
삼성전자 평택 P-Project
초순수 건설공사 [PH-1]
UT동 시설공사
UPW Treatment System
– Heat exchanger – 1,2,3
– A/C Tower
– Recovery A/C Tower
– UV Sterilizer
– Auto Filter
– RO – 1,2 Unit
– 1st Membrane Degasifier
– CEDI – 1,2 Unit
– TOC Reduction UV
– Giant Deionizer
– 2nd Membrane Degasifier
8,000m3/day 평택
(Korea)
2016 동우 화인켐 (TS-2 Phase 2)
Dongwoo Fine Chem. TS-2 Phase 2Project
DEMI. & UPW Treatment System
Wastewater Reclaim System
Wastewater Treatment System
– N-Treatment (MLE Process)
– N-Treatment for Reclaim R/O Concentrate
– F-Treatment for Reclaim R/O Concentrate
4,500m3/day

7,500m3/day

7,500m3/day

2,500m3/day

300m3/day

평택
(Korea)
2015 Samsung Electronics
화성공장 S3-B UPW UT3동설비공사(Ph2)
Pretreatment System
– H/E
– AC
– 1st R/O, MDG
Make-Up System
– 2nd R/O
– CEDI
– TOC UV
Recovery System
– AC
– UV
– Recovery R/O
560m3/hr

459m3/hr

168m3/hr

화성
HwaSung
(Korea)
2015 LG Display
파주공장
P9 IT 20K 환경설비증설공사
DI System
– AC Tower
– SC Tower
– De-gasifier
– SC/SA Tower
– Polisher
– Hero Unit
– Pre-filter
– CDI/HDI Unit
6,700m3/day 파주
(Korea)
2015 LG Display
중국남경공장
N3 Auto
DI System
– MMF
– AC
– HE
– Safety Filter
– R/O
– CEDI
– Cooler
– UV
– MF
1,200m3/day 남경
Nanjing
(China)
2014 Samsung Electronics
UPW Retrofit Project
Pretreatment System
– AC
– 1st R/O
– MDG
Make-Up System
– 2nd R/O
– CEDI
UPW Polishing System
– TOC UV
– Anion Polisher
– Polishing MDG
– Cooler
– MBPolisher
– UF
Recovery System
– AC
– Recovery R/O
Chemical injection Package
500m3/hr 기흥
(Korea)
2013 Samsung Electronics
화성공장 S3-B
Pretreatment System
– H/E
– AC
– H/E
– UV
–  Pre Filter
– 1st R/O
– 2nd R/O
– Brain R/O
Make-up Demi. Water System
– MDG
– CEDI
– CEDI
– TOC UV
– MBP
– MDG
Recovery Water & Chemical injection system
– Recovery A/C Tower
– Recovery Pre Filter
– Recovery R/O
– Chemical Injection
– Neutralization
 

1275m3/hr

 

954m3/hr

 

338m3/hr

 

 

 

화성
HwaSung
(Korea)
2013 이집트 ERC Refinery Project Raw Water Treatment Package
– Coagulation & Flocculation
– DAF
– Sand Filter
Demi. Water Treatment Package
– UF
– Recovery UF
– R/O
– MBP
– Chemical Injection
955m3/hr

 

805m3/hr

 

 

이집트

(Egypt)

2013 Dongwoo Fine Chem
TS-2 PROJECT
DEMI.Water Treatment System
– AC
– H/E
– 1st R/O
UPW Treatment System
– 2nd R/O
– CEDI
– Cooler
– TOC UV
– Anion polisher
– MBP
– MDG
– UV
– UF
Waste Water Treatment System
Waste Water Reclaim System
– pH Control
– Aeration
– MBR,
– Air Separation
– R/O
6,312m3/day

 

4,584m3/day

 

400m3/day

 

4,992m3/day

평택
Pyoung-Taek
(Korea)
2013 LG Display
(중국광주공장)
D-Project
A/C Filter
S.C Tower
Degasifier
HE R/O
Reject R/O
S.C/S.A Tower
MDG
Seal Water Cooler
TOC UV
Polisher
UF
25,000m3/day 광저우
Guangzhou
(China)
2013 LG Display
M2 Make-Up Project
DEMI. & UPW SYSTEM
-A/C
– SC Tower
– De-gasifier
– HE R/O
– SC/CA Tower
– MDG
320m3/hr 파주
Paju
(Korea)

Year Project Name Applied Technologies Capa Site
2017 Samsung Electronics S3 Project
Wasteater Treatment System Phase-3
삼성전자 S3 프로젝트 폐수처리설비
Phase 3
Organic Waste Water Treatment System
– Coagulation & Flocculation
– Biological(Bardenpho)
– HVAC System
1st Inorganic Waste Water  Treatment System
– Coagulation & flocculation
– Clarifier
2nd Inorganic Waste Water Treatment System
– Coagulation  & Flocculation
– Clarifier
32,000m3/day

2,682m3/day

42,000m3/day

화성
(Korea)
2016 대한유화 KPIC One Project Water & Wastewater, Side Stream Filter Water Treatment System
– Activated Carbon Filter
-2B3T
– Mixed Bed Polisher
Wastewater Treatment System
– Mixed Bed Polisher
– MBR Unit
Side Stream Filter
160m3/hr

75m3/hr

485m3/hr

온산
(Korea)
2015 GS파워
안양열병합발전소
Raw Water Supply & Pretreatment System

Make-Up Demi. Water Treatment System

Reuse System

Wastewater Treatment System

960m3/hr

40m3/hr

135m3/hr

30m3/hr

안양

(Korea)

2015 삼성전자
S3 페수처리 기계설비 및 배관공사 (Ph-2)
Wastewater Treatment System 12,000 3/day 화성

(Korea)

2013 베트남 NSRP PROJECT Wastewater Treatment System

– API, CPI, FFU PACKAGE, Coagulation & Flocculation, D.A.F,
Biological Treatment Package, Aeration, Clarifier,
Tertiary Oxidation Package, Ozone System,

Tertiary Physicochemical Treatment Package,
Sludge Dewatering Package,

Chemical Dosing System,
Caustic Oxidation System

700m3/hr 베트남

(Vietnam)

2013 이집트 ERC Refinery Project Waste water treatment system
– Oil Separator, CPI, Equalization,
pH Adjustment & Coagulation & Flocculation, D.A.F, Aeration, Clarifier, Sand Filter, A/C Filter, Thickener, Dehydrator,
Spent Caustic OZONE system,
Chemical Dosing System
425m3/hr 이집트

(Egypt)

2013 이집트 ERC Refinery Project Condensate Polisher Package
– Condensate A/C Filter, Condensate Polisher ,
Chemical Dosing
230m3/hr 이집트

(Egypt)

2013 동우화인켐(주) TS-2 PROJECT 초순수설비 및 폐수처리장 설치공사 DEMI.Water treatment System
– A/C, H/E, 1st R/O,
UPW Treatment System
– 2nd R/O, CEDI, Cooler, TOC UV, Anion polisher, MBP,
MDG , UV , UF unit
Waste Water Treatment System
Waste Water Reclaim System
– pH Control Tank, Aeration, MBR, Air Separation, R/O
6,312m3/day

 

4,584m3/day

 

 

400m3/day

 

4,992m3/day

평택
Pyoung Taek (Korea)
2012 사천현대기차유한회사
용수 및 폐수처리시스템
Water Treatment System
Waste Water Treatment System
– pH Control & Coagulation & Flocculation, Sedimentation, MMF, Chelate Resin Tower,
PH Control & Coagulation & Flocculation, DAF,
Sand Filter, ED,
pH Control & Coagulation & Flocculation, ED, DAF, Aeration, ED, Sedimentation, Belt Press
1,440m3/day

600m3/day

 

 

1,150m3/day

400m3/day

사천 Sichuan
(China)

Year Project Name Applied Technologies Capa Site
2012 POSCO(주) FINEX 3호기신설 응축수 진공 시스템 BFG 응축수 진공식 이송 시스템 1000 포항
2011 (주)현대미포조선 진공식 오수이송 시스템 진공식오수이송SYSTEM 180m3/hr 울산
2009 남강댐 진공하수 집수시스템 -안의마을 진공하수 집수시스템
-송계마을 진공하수 집수시스템
95m3/day
120m3/day
남강댐
2009 삼성전자 구미공장 진공하수 집수시스템 -우수,오수 관로분리
-중게펌프장 설치
구미
2008 대청댐 진공하수 집수시스템 -초강마을 진공하수 집수시스템
-추풍령마을 진공하수 집수시스템
-신평마을 집수시스템
99m3/day
136m3/day
96m3/day
대청댐
2006 현대중공업(주) 진공오.폐수집수시스템 -해양공장
진공관길이 : 2,300m
집수용량
진동밸브POT수량 : 12EA
-본 공장 1구역
진공관길이 : 4,500m
집수용량
진동밸브POT수량 : 27EA
-본 공장 2구역
진공관길이 : 5,000m
집수용량
진동밸브POT수량 : 38EA
952ℓ/min

1,478ℓ/min

2,570ℓ/min

울산

Year Project Name Applied Technologies Capa Site
2017 XUYOU Electric Materials WPL PVA Removal Package PVA Removal Filter & RO Package
– NF Filtering System
– RO System
240m3/hr 중국 무석
(Wuxi, China)
2016 구미시 하수처리수 재이용 시설 BTO 건설공사
GUMI Sewage Wastewater
Reuse System
BTO Construction
Sewage Wastewater Reuse System
– Reaction / Coag. / Floc. Tank
– Inclination Plate Settler
RO System
– Micro Filter
– RO Unit
177,600m3/day

126,700m3/day

구미Gumi
(Korea)
2016 LG 디스플레이 파주 P8 E42 TFT 대응 환경설비공사 DI System
LG Display PAJU P8 E42 TFT
Environmental Facility Construction
DI System
DI System
– Auto Strainer
– Heat Exchanger
– MF Unit
Reclaim
– MF Unit
– Polishing Line Pipings
7,200m3/day

63m3/hr

20,000m3/day

파주
(Korea)
2013 LG디스플레이(주) 구미 P61 LTPS 방류수 재이용 시스템 MBR, RO 20,000m3/day

 

구미Gumi
(Korea)
2011 LG Display
방류수 재이용 시설공사
Equalization, pH Control, Aeration, MBR, RO 10,000m3/day 구미
2010 LG Display

환경설비 2차 재이용 설비

AC, JMF, RO 14m3/hr 구미

+ 순수 및 초순수처리설비

Year Project Name Applied Technologies Capa Site
2017 Samsung Electronics Pyeongtaek
P-Project UPW System [PH-2]
FAB. Facillity Construction
삼성전자 평택 P-Project
초순수 건설공사 [PH-2]
FAB동 시설공사
UPW Treatment System
– Heat exchanger
– UV Sterilizer
– NSP
– Membrane Degasifier
– Mixed Bed Polisher
– UF Unit- Pre Heater
– Recovery Tank
10,000m3/day 평택
(Korea)
2016 LG 디스플레이 베트남 V-Project
UPW & 재이용 System
LG Display V-Project UPW
& Reuse System
Softener Package
UPW Treatment System
– MF Unit
– A/C Filter
– Heat Exchanger
– 1st RO Unit
– CEDI Unit
– Cooler
– UV Sterilizer
– Final Filter
Reclaim & Reuse System
– Reclaim MF Unit
– Reuse Pressure Filter
2,160m3/day
1,440m3/day        1,040m3/day
베트남
(Vietnam)
2016 Samsung Electronics Pyeongtaek
P-Project UPW System [PH-1]
FAB. Machine Room Construction
삼성전자 평택 P-Project
초순수 건설공사 [PH-1]
FAB동 기계실 공사
UPW Treatment System
– Heat exchanger
– TOC reduction UV
– NSP
– Membrane Degasifier
– Mixed Bed Polisher
– UF Unit
– Heater
– Recovery Tank
8,000m3/day 평택
(Korea)
2016 LG디슬플레이 파주 P9 C-Project 대응 환경설비공사 (용수전처리)
LG Display PAJU P9 C-Project Environmental Facility Construction
(Industrial Water Pretreatment)
Industrial Water Preatreatment
– Auto Strainer
– Heat exchanger
– MF Unit- Reclaim MF Unit
31,680m3/day   63m3/hr 파주
(Korea)
2016 Samsung Electronics Pyeongtaek
P-Project UPW System [PH-1]
UT Facility Construction
삼성전자 평택 P-Project
초순수 건설공사 [PH-1]
UT동 시설공사
UPW Treatment System
– Heat exchanger – 1,2,3
– A/C Tower
– Recovery A/C Tower
– UV Sterilizer
– Auto Filter
– RO – 1,2 Unit
– 1st Membrane Degasifier
– CEDI – 1,2 Unit
– TOC Reduction UV
– Giant Deionizer
– 2nd Membrane Degasifier
8,000m3/day 평택
(Korea)
2016 동우 화인켐 (TS-2 Phase 2)
Dongwoo Fine Chem. TS-2 Phase 2Project
DEMI. & UPW Treatment System
Wastewater Reclaim System
Wastewater Treatment System
– N-Treatment (MLE Process)
– N-Treatment for Reclaim R/O Concentrate
– F-Treatment for Reclaim R/O Concentrate
4,500m3/day

7,500m3/day

7,500m3/day

2,500m3/day

300m3/day

평택
(Korea)
2015 Samsung Electronics
화성공장 S3-B UPW UT3동설비공사(Ph2)
Pretreatment System
– H/E
– AC
– 1st R/O, MDG
Make-Up System
– 2nd R/O
– CEDI
– TOC UV
Recovery System
– AC
– UV
– Recovery R/O
560m3/hr

459m3/hr

168m3/hr

화성
HwaSung
(Korea)
2015 LG Display
파주공장
P9 IT 20K 환경설비증설공사
DI System
– AC Tower
– SC Tower
– De-gasifier
– SC/SA Tower
– Polisher
– Hero Unit
– Pre-filter
– CDI/HDI Unit
6,700m3/day 파주
(Korea)
2015 LG Display
중국남경공장
N3 Auto
DI System
– MMF
– AC
– HE
– Safety Filter
– R/O
– CEDI
– Cooler
– UV
– MF
1,200m3/day 남경
Nanjing
(China)
2014 Samsung Electronics
UPW Retrofit Project
Pretreatment System
– AC
– 1st R/O
– MDG
Make-Up System
– 2nd R/O
– CEDI
UPW Polishing System
– TOC UV
– Anion Polisher
– Polishing MDG
– Cooler
– MBPolisher
– UF
Recovery System
– AC
– Recovery R/O
Chemical injection Package
500m3/hr 기흥
(Korea)
2013 Samsung Electronics
화성공장 S3-B
Pretreatment System
– H/E
– AC
– H/E
– UV
–  Pre Filter
– 1st R/O
– 2nd R/O
– Brain R/O
Make-up Demi. Water System
– MDG
– CEDI
– CEDI
– TOC UV
– MBP
– MDG
Recovery Water & Chemical injection system
– Recovery A/C Tower
– Recovery Pre Filter
– Recovery R/O
– Chemical Injection
– Neutralization
 

1275m3/hr

 

954m3/hr

 

338m3/hr

 

 

 

화성
HwaSung
(Korea)
2013 이집트 ERC Refinery Project Raw Water Treatment Package
– Coagulation & Flocculation
– DAF
– Sand Filter
Demi. Water Treatment Package
– UF
– Recovery UF
– R/O
– MBP
– Chemical Injection
955m3/hr

 

805m3/hr

 

 

이집트

(Egypt)

2013 Dongwoo Fine Chem
TS-2 PROJECT
DEMI.Water Treatment System
– AC
– H/E
– 1st R/O
UPW Treatment System
– 2nd R/O
– CEDI
– Cooler
– TOC UV
– Anion polisher
– MBP
– MDG
– UV
– UF
Waste Water Treatment System
Waste Water Reclaim System
– pH Control
– Aeration
– MBR,
– Air Separation
– R/O
6,312m3/day

 

4,584m3/day

 

400m3/day

 

4,992m3/day

평택
Pyoung-Taek
(Korea)
2013 LG Display
(중국광주공장)
D-Project
A/C Filter
S.C Tower
Degasifier
HE R/O
Reject R/O
S.C/S.A Tower
MDG
Seal Water Cooler
TOC UV
Polisher
UF
25,000m3/day 광저우
Guangzhou
(China)
2013 LG Display
M2 Make-Up Project
DEMI. & UPW SYSTEM
-A/C
– SC Tower
– De-gasifier
– HE R/O
– SC/CA Tower
– MDG
320m3/hr 파주
Paju
(Korea)

+ 하폐수처리설비

Year Project Name Applied Technologies Capa Site
2017 Samsung Electronics S3 Project
Wasteater Treatment System Phase-3
삼성전자 S3 프로젝트 폐수처리설비
Phase 3
Organic Waste Water Treatment System
– Coagulation & Flocculation
– Biological(Bardenpho)
– HVAC System
1st Inorganic Waste Water  Treatment System
– Coagulation & flocculation
– Clarifier
2nd Inorganic Waste Water Treatment System
– Coagulation  & Flocculation
– Clarifier
32,000m3/day

2,682m3/day

42,000m3/day

화성
(Korea)
2016 대한유화 KPIC One Project Water & Wastewater, Side Stream Filter Water Treatment System
– Activated Carbon Filter
-2B3T
– Mixed Bed Polisher
Wastewater Treatment System
– Mixed Bed Polisher
– MBR Unit
Side Stream Filter
160m3/hr

75m3/hr

485m3/hr

온산
(Korea)
2015 GS파워
안양열병합발전소
Raw Water Supply & Pretreatment System

Make-Up Demi. Water Treatment System

Reuse System

Wastewater Treatment System

960m3/hr

40m3/hr

135m3/hr

30m3/hr

안양

(Korea)

2015 삼성전자
S3 페수처리 기계설비 및 배관공사 (Ph-2)
Wastewater Treatment System 12,000 3/day 화성

(Korea)

2013 베트남 NSRP PROJECT Wastewater Treatment System

– API, CPI, FFU PACKAGE, Coagulation & Flocculation, D.A.F,
Biological Treatment Package, Aeration, Clarifier,
Tertiary Oxidation Package, Ozone System,

Tertiary Physicochemical Treatment Package,
Sludge Dewatering Package,

Chemical Dosing System,
Caustic Oxidation System

700m3/hr 베트남

(Vietnam)

2013 이집트 ERC Refinery Project Waste water treatment system
– Oil Separator, CPI, Equalization,
pH Adjustment & Coagulation & Flocculation, D.A.F, Aeration, Clarifier, Sand Filter, A/C Filter, Thickener, Dehydrator,
Spent Caustic OZONE system,
Chemical Dosing System
425m3/hr 이집트

(Egypt)

2013 이집트 ERC Refinery Project Condensate Polisher Package
– Condensate A/C Filter, Condensate Polisher ,
Chemical Dosing
230m3/hr 이집트

(Egypt)

2013 동우화인켐(주) TS-2 PROJECT 초순수설비 및 폐수처리장 설치공사 DEMI.Water treatment System
– A/C, H/E, 1st R/O,
UPW Treatment System
– 2nd R/O, CEDI, Cooler, TOC UV, Anion polisher, MBP,
MDG , UV , UF unit
Waste Water Treatment System
Waste Water Reclaim System
– pH Control Tank, Aeration, MBR, Air Separation, R/O
6,312m3/day

 

4,584m3/day

 

 

400m3/day

 

4,992m3/day

평택
Pyoung Taek (Korea)
2012 사천현대기차유한회사
용수 및 폐수처리시스템
Water Treatment System
Waste Water Treatment System
– pH Control & Coagulation & Flocculation, Sedimentation, MMF, Chelate Resin Tower,
PH Control & Coagulation & Flocculation, DAF,
Sand Filter, ED,
pH Control & Coagulation & Flocculation, ED, DAF, Aeration, ED, Sedimentation, Belt Press
1,440m3/day

600m3/day

 

 

1,150m3/day

400m3/day

사천 Sichuan
(China)

+ 진공하수집수시스템

Year Project Name Applied Technologies Capa Site
2012 POSCO(주) FINEX 3호기신설 응축수 진공 시스템 BFG 응축수 진공식 이송 시스템 1000 포항
2011 (주)현대미포조선 진공식 오수이송 시스템 진공식오수이송SYSTEM 180m3/hr 울산
2009 남강댐 진공하수 집수시스템 -안의마을 진공하수 집수시스템
-송계마을 진공하수 집수시스템
95m3/day
120m3/day
남강댐
2009 삼성전자 구미공장 진공하수 집수시스템 -우수,오수 관로분리
-중게펌프장 설치
구미
2008 대청댐 진공하수 집수시스템 -초강마을 진공하수 집수시스템
-추풍령마을 진공하수 집수시스템
-신평마을 집수시스템
99m3/day
136m3/day
96m3/day
대청댐
2006 현대중공업(주) 진공오.폐수집수시스템 -해양공장
진공관길이 : 2,300m
집수용량
진동밸브POT수량 : 12EA
-본 공장 1구역
진공관길이 : 4,500m
집수용량
진동밸브POT수량 : 27EA
-본 공장 2구역
진공관길이 : 5,000m
집수용량
진동밸브POT수량 : 38EA
952ℓ/min

1,478ℓ/min

2,570ℓ/min

울산

+ 재이용설비

Year Project Name Applied Technologies Capa Site
2017 XUYOU Electric Materials WPL PVA Removal Package PVA Removal Filter & RO Package
– NF Filtering System
– RO System
240m3/hr 중국 무석
(Wuxi, China)
2016 구미시 하수처리수 재이용 시설 BTO 건설공사
GUMI Sewage Wastewater
Reuse System
BTO Construction
Sewage Wastewater Reuse System
– Reaction / Coag. / Floc. Tank
– Inclination Plate Settler
RO System
– Micro Filter
– RO Unit
177,600m3/day

126,700m3/day

구미Gumi
(Korea)
2016 LG 디스플레이 파주 P8 E42 TFT 대응 환경설비공사 DI System
LG Display PAJU P8 E42 TFT
Environmental Facility Construction
DI System
DI System
– Auto Strainer
– Heat Exchanger
– MF Unit
Reclaim
– MF Unit
– Polishing Line Pipings
7,200m3/day

63m3/hr

20,000m3/day

파주
(Korea)
2013 LG디스플레이(주) 구미 P61 LTPS 방류수 재이용 시스템 MBR, RO 20,000m3/day

 

구미Gumi
(Korea)
2011 LG Display
방류수 재이용 시설공사
Equalization, pH Control, Aeration, MBR, RO 10,000m3/day 구미
2010 LG Display

환경설비 2차 재이용 설비

AC, JMF, RO 14m3/hr 구미